Package index
-
ac() - Actual Cost (AC).
-
building_project - Mid-Rise Commercial Building Construction Project
-
contingency() - Contingency Calculation.
-
cor_matrix() - Generate Correlation Matrix from Random Samples.
-
cost_pdf() - Cost Probability Density.
-
cost_post_pdf() - Posterior Cost Probability Density.
-
cpi() - Cost Performance Index (CPI).
-
cv() - Cost Variance (CV).
-
eac() - Estimate at Completion (EAC).
-
etc() - Estimate to Complete (ETC).
-
ev() - Earned Value (EV).
-
fit_sigmoidal() - Fit a Sigmoidal Model to Data.
-
grandparent_dsm() - Risk-based 'Grandparent' Design Structure Matrix (DSM).
-
mcs() - Monte Carlo Simulation.
-
parent_dsm() - Resource-based 'Parent' Design Structure Matrix (DSM).
-
plot(<dsm>) - Plot a DSM heatmap.
-
plot(<mcs>) - Plot Monte Carlo Simulation results.
-
plot(<pra_sigmoidal_fit>) - Plot a sigmoidal model fit.
-
plot(<prob_net>) - Plot a probabilistic network.
-
plot(<smm>) - Plot Second Moment Method results.
-
plot_sigmoidal() - Plot a Fitted Sigmoidal Model.
-
pra_mcp_server() - Start a PRA MCP Server
-
pra_tools() - Create PRA Tool Definitions for LLM Agent
-
predict_sigmoidal() - Predict a Sigmoidal Function Using Fitted Model.
-
print(<dsm>) - Print a DSM object.
-
print(<mcs>) - Print method for Monte Carlo Simulation results.
-
print(<pra_sigmoidal_fit>) - Print method for Sigmoidal Model
-
print(<prob_net>) - Print a probabilistic network.
-
print(<smm>) - Print method for SMM results.
-
print(<summary.dsm>) - Print a DSM summary.
-
print(<summary.mcs>) - Print a Monte Carlo Simulation summary.
-
print(<summary.pra_sigmoidal_fit>) - Print a sigmoidal model fit summary.
-
print(<summary.prob_net>) - Print a probabilistic network summary.
-
print(<summary.smm>) - Print a Second Moment Method summary.
-
prob_net() - Probabilistic Network of Project Risks.
-
prob_net_learn() - Perform Bayesian Learning on a Probabilistic Network of Project Risks.
-
prob_net_sim() - Perform Inference on a Probabilistic Network of Project Risks.
-
prob_net_update() - Update a Probabilistic Network of Project Risks.
-
pv() - Planned Value (PV).
-
risk_post_prob() - Posterior Risk Probability.
-
risk_prob() - Bayesian Inference for Risk Probability.
-
sensitivity() - Sensitivity Analysis.
-
smm() - Second Moment Method Analysis.
-
spi() - Schedule Performance Index (SPI).
-
summary(<dsm>) - Summarize a DSM object.
-
summary(<mcs>) - Summarize Monte Carlo Simulation results.
-
summary(<pra_sigmoidal_fit>) - Summarize a sigmoidal model fit.
-
summary(<prob_net>) - Summarize a probabilistic network.
-
summary(<smm>) - Summarize Second Moment Method results.
-
sv() - Schedule Variance (SV).
-
tcpi() - To-Complete Performance Index (TCPI).
-
vac() - Variance at Completion (VAC).